Economical production in competence centres

Voith Group, Heidenheim

Arbeitsplanung in SAP: Die Voith Group setzt auf HSiAn important factor for economical production that can take place regardless of location is central costing and work planning based on a reliable time management system. For this, the Voith Group makes use of a time management system and costing solution with HSi GmbH modules which works across the whole plant.

Requirements of the Voith Group:

  • • Increased planning reliability
  • • standard costing and work planning solution, which can be adjusted according to the specific plant
  • • solution should be integrated directly into SAP
  • • withstand the IT governance requirements
  • • should take the pressure off users carrying out costing and work planning in their daily tasks

 

 

Download Case Study